
Product appearance shown for model identification.
LG ENERGY SOLUTION · Pouch Cells
LG P41 41Ah
41Ah catalog class with a drawing-first design review
Check the approved compression and thickness allowance for the exact revision before finalizing the enclosure.
Discuss this model on WhatsApp ↗For OEMs, battery pack manufacturers and industrial buyers.
MODEL OVERVIEW
LG P41 41Ah — Selection & Sourcing
LG P41 is a pouch battery cell with 40.8Ah minimum capacity at 25°C and 0.3C, a 3.63V nominal voltage and 148Wh reference energy in the official LG catalog. For industrial mobility modules, these values provide a more useful comparison than a rounded 41Ah label alone. The published pulse-current figures apply for ten seconds at 50% state of charge, 25°C and beginning of life. They should not be read as continuous ratings or transferred to a different cooling arrangement without an engineering review.
For a pouch-cell project, share the module envelope, current profile and charging schedule. The review should include tab connections, insulation, cell support and the conditions used to measure thickness. These details help turn a catalog comparison into a practical qualification plan for the finished battery pack.
BK Energy can discuss LG P41 41Ah wholesale sourcing with your purchasing team. Include the sample quantity, expected production volume, delivery destination and documents needed for supplier approval so the quotation addresses both technical and commercial requirements.
TECHNICAL REFERENCE
Specifications & Operating Conditions
Read each value with its test conditions. Confirm the applicable document revision before design approval.
| Model / catalog code | LG P41 41Ah |
|---|---|
| Cell format | Pouch Cells |
| Minimum capacity | 40.8Ah at 25°C, 0.3C |
| Nominal voltage | 3.63V |
| Reference energy | 148Wh |
| Electrode system | NCM / graphite |
| Dimensions — L × W × T | 266.5 × 139 × 8.22 mm |
| Reference weight | 654.5g |
| Pulse charge current | 380A — 10 seconds, SOC 50%, 25°C, beginning of life |
| Pulse discharge current | 380A — 10 seconds, SOC 50%, 25°C, beginning of life |
| Discharge test reference | 5C, 12 minutes, 25°C; cooling and derating conditions apply |
Specification basis
LG cell specifications, December 2023. Official catalog reference only; values depend on cooling, derating and customer system definition. Visually checked original PDF.
View manufacturer reference ↗APPLICATION REVIEW
What to Check for Your Pack
For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell.
- Energy and load: usable energy, continuous current, peak duration and charging opportunities.
- Mechanical and thermal fit: the exact drawing, connections, enclosure temperature and cooling arrangement.
- Qualification: a test plan based on the finished equipment, including its protection settings and required approvals.
PROCUREMENT DOCUMENTS
Datasheet, Traceability & Certificates
Ask for the specification and drawing that match the offered lot. If your project needs a UN 38.3 test summary, SDS or a particular cell certificate, include that requirement in the enquiry.
BUYER QUESTIONS
Before You Order
Is this cell suitable for my application?
For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell. Application names on this page are evaluation starting points, not a claim that an OEM has approved this exact cell.
Can I get the LG P41 41Ah datasheet?
Yes—send the complete model code and your project requirements. We will review the matching specification and available documentation with you. Any preliminary values should be confirmed before production approval.
What are the wholesale price, MOQ and lead time?
These are quoted for the requested model, quantity, available lot and destination. Send sample demand and expected production volume so the offer can address your schedule.
Which documents should accompany the order?
Ask for the applicable specification revision, lot identification, SDS and UN 38.3 test summary, plus any model-specific certificates required for your market. Cell documents do not replace finished-pack or equipment approval.



