English
English Current
LG N2.1 60Ah pouch battery cell

Product appearance shown for model identification.

LG ENERGY SOLUTION · Pouch Cells

LG N2.1 60Ah

Confirm the capacity revision for the N2.1 catalog entry

Capacity / format60Ah catalog class
Data basisCatalog reference

Keep the 60Ah catalog label separate from the unconfirmed 58.4Ah N21 document until the model mapping is resolved.

Discuss this model on WhatsApp ↗

For OEMs, battery pack manufacturers and industrial buyers.

MODEL OVERVIEW

LG N2.1 60Ah — Selection & Sourcing

LG N2.1 is listed in our catalog in the 60Ah class, but its exact capacity revision needs confirmation before engineering selection. The related N21 document available for review describes a 58.4Ah cell and does not establish a complete match to the N2.1 marking. For buyers developing an industrial energy pack, that difference matters to energy calculations and acceptance tests. A quotation should therefore identify the full cell code, capacity revision and corresponding LG pouch-cell specification before a sample order is used to qualify the design.

For a pouch-cell project, share the module envelope, current profile and charging schedule. The review should include tab connections, insulation, cell support and the conditions used to measure thickness. These details help turn a catalog comparison into a practical qualification plan for the finished battery pack.

BK Energy can discuss LG N2.1 60Ah wholesale sourcing with your purchasing team. Include the sample quantity, expected production volume, delivery destination and documents needed for supplier approval so the quotation addresses both technical and commercial requirements.

TECHNICAL REFERENCE

Specifications & Operating Conditions

Read each value with its test conditions. Confirm the applicable document revision before design approval.

Model / catalog codeLG N2.1 60Ah
Cell formatPouch Cells
Catalog capacity class60Ah catalog class — verify minimum capacity and test conditions
Nominal / limiting voltagesConfirm in the matching cell specification
Charge and discharge currentConfirm continuous, pulse and temperature limits
Cycle lifeRequest test current, voltage window and retention criterion
Specification basis

Catalog entry and product identification. Request the exact manufacturer specification for the offered revision.

APPLICATION REVIEW

What to Check for Your Pack

Large-format module sourcingIndustrial energy pack development

For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell.

  • Energy and load: usable energy, continuous current, peak duration and charging opportunities.
  • Mechanical and thermal fit: the exact drawing, connections, enclosure temperature and cooling arrangement.
  • Qualification: a test plan based on the finished equipment, including its protection settings and required approvals.

PROCUREMENT DOCUMENTS

Datasheet, Traceability & Certificates

Ask for the specification and drawing that match the offered lot. If your project needs a UN 38.3 test summary, SDS or a particular cell certificate, include that requirement in the enquiry.

BUYER QUESTIONS

Before You Order

Is this cell suitable for my application?

For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell. Application names on this page are evaluation starting points, not a claim that an OEM has approved this exact cell.

Can I get the LG N2.1 60Ah datasheet?

Yes—send the complete model code and your project requirements. We will review the matching specification and available documentation with you. Any preliminary values should be confirmed before production approval.

What are the wholesale price, MOQ and lead time?

These are quoted for the requested model, quantity, available lot and destination. Send sample demand and expected production volume so the offer can address your schedule.

Which documents should accompany the order?

Ask for the applicable specification revision, lot identification, SDS and UN 38.3 test summary, plus any model-specific certificates required for your market. Cell documents do not replace finished-pack or equipment approval.

↑