English
English Current
LG F10 10Ah pouch battery cell

Product appearance shown for model identification.

LG ENERGY SOLUTION · Pouch Cells

LG F10 10Ah

10Ah catalog class for a flatter pouch layout

Capacity / format10Ah catalog class
Data basisCatalog reference

Confirm terminal material, spacing and approved joining method in the current drawing and specification.

Discuss this model on WhatsApp ↗

For OEMs, battery pack manufacturers and industrial buyers.

MODEL OVERVIEW

LG F10 10Ah — Selection & Sourcing

LG F10 is listed as a 10Ah pouch cell and is shown with both terminals at one end. That terminal layout may be useful to discuss when cable routing or the connection side of a module is fixed, although the exact drawing must be checked before production. Buyers comparing LG pouch cells for portable industrial equipment should review the available support area, tab joining process and required current profile. The smaller capacity class does not on its own establish suitability for a high-power or lightweight application.

For a pouch-cell project, share the module envelope, current profile and charging schedule. The review should include tab connections, insulation, cell support and the conditions used to measure thickness. These details help turn a catalog comparison into a practical qualification plan for the finished battery pack.

BK Energy can discuss LG F10 10Ah wholesale sourcing with your purchasing team. Include the sample quantity, expected production volume, delivery destination and documents needed for supplier approval so the quotation addresses both technical and commercial requirements.

TECHNICAL REFERENCE

Specifications & Operating Conditions

Read each value with its test conditions. Confirm the applicable document revision before design approval.

Model / catalog codeLG F10 10Ah
Cell formatPouch Cells
Catalog capacity class10Ah catalog class — verify minimum capacity and test conditions
Catalog outline — T × W × L4 × 130 × 315 mm; engineering tolerances to be confirmed
Nominal / limiting voltagesConfirm in the matching cell specification
Charge and discharge currentConfirm continuous, pulse and temperature limits
Cycle lifeRequest test current, voltage window and retention criterion
Specification basis

Catalog entry and product identification. Request the exact manufacturer specification for the offered revision.

APPLICATION REVIEW

What to Check for Your Pack

Compact custom modulesPortable industrial equipment

For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell.

  • Energy and load: usable energy, continuous current, peak duration and charging opportunities.
  • Mechanical and thermal fit: the exact drawing, connections, enclosure temperature and cooling arrangement.
  • Qualification: a test plan based on the finished equipment, including its protection settings and required approvals.

PROCUREMENT DOCUMENTS

Datasheet, Traceability & Certificates

Ask for the specification and drawing that match the offered lot. If your project needs a UN 38.3 test summary, SDS or a particular cell certificate, include that requirement in the enquiry.

BUYER QUESTIONS

Before You Order

Is this cell suitable for my application?

For these project types, review the tab drawing, support and compression requirements, thermal contact and the current profile before selecting the cell. Application names on this page are evaluation starting points, not a claim that an OEM has approved this exact cell.

Can I get the LG F10 10Ah datasheet?

Yes—send the complete model code and your project requirements. We will review the matching specification and available documentation with you. Any preliminary values should be confirmed before production approval.

What are the wholesale price, MOQ and lead time?

These are quoted for the requested model, quantity, available lot and destination. Send sample demand and expected production volume so the offer can address your schedule.

Which documents should accompany the order?

Ask for the applicable specification revision, lot identification, SDS and UN 38.3 test summary, plus any model-specific certificates required for your market. Cell documents do not replace finished-pack or equipment approval.

↑